Interior finishing work during a commercial tenant improvement

Commercial tenant improvements: a practical guide

What a TI actually involves, who pays for what, and why the date matters more than the budget.

A tenant improvement — a TI — is the work that turns a bare or previously occupied commercial space into something a specific tenant can operate in. It is the most deadline-driven construction most businesses ever commission, and the deadline is usually written into a lease.

What is normally in scope

  • Demising walls and interior partitions that define the space.
  • Ceilings, flooring and wall finishes.
  • Lighting, and the electrical and data distribution behind it.
  • Millwork and built-in casework — reception desks, counters, storage.
  • Washrooms, and any plumbing the layout requires.
  • Mechanical adjustments: HVAC distribution, diffusers, zoning for the new layout.
  • Coordination of the trades and consultants all of the above requires.

Who pays: the TI allowance

Most commercial leases include a tenant improvement allowance — a contribution from the landlord toward fitting out the space, often expressed per square foot. Two things about allowances catch tenants out.

First, an allowance is rarely the full cost. Anything beyond base-building standard — better finishes, a more complex layout, specialised equipment — is normally the tenant's own cost. Second, allowances are usually paid on completion against invoices, not advanced at the start, so the tenant finances the work in the interim. Both are worth confirming in writing before the scope grows.

The schedule is the real risk

A TI that overruns rarely fails on construction. It fails on the things in front of construction: permits, drawings, long-lead materials and landlord approvals. Meanwhile the lease commencement date does not move, so a tenant can end up paying rent on a space they cannot occupy while still paying rent somewhere else.

Which is why an optimistic schedule is worse than a long one. Ask any contractor quoting your TI what their assumptions are on permit timing and material lead times, and what happens to the date if those slip.

Working in an occupied building

Most TIs happen in buildings where other tenants are trading and, in mixed-use, residents are living. That is a different discipline from building something empty, and it needs to be in the scope from the start:

  • Staged scheduling around the hours the building actually operates.
  • Dust and noise control, and protection of shared corridors and elevators.
  • Exits and life-safety routes kept usable throughout.
  • Notices to neighbouring tenants or residents before anything disruptive.
  • Loading bay and service elevator bookings — on a tight downtown site, this constraint alone can shape the programme.

How to compare quotes properly

The lowest TI quote is frequently the one with the vaguest scope, and the gap gets recovered through change orders once the work has started and you have no leverage. Ask for the scope in writing, with exclusions listed explicitly. A contractor willing to tell you what is not included is giving you the more useful number.

Frequently asked

A tenant improvement, or TI, is construction work that adapts a commercial space for a specific tenant — demising walls, ceilings, flooring, lighting, finishes, millwork and washrooms, plus the mechanical and electrical work the new layout requires. It is commissioned by the landlord, the tenant, or both, and is usually tied to a lease commencement date.
Commonly both. Many leases include a tenant improvement allowance from the landlord, often expressed per square foot, with anything above base-building standard paid by the tenant. Allowances are frequently reimbursed on completion against invoices rather than advanced, which means the tenant carries the cost in the meantime. The specifics live in the lease and are worth confirming before the scope expands.
It depends on scope, permit timelines and material lead times, so any answer before a site visit is guesswork. The part worth scrutinising is not the construction duration but the assumptions in front of it — how long permits and drawings are expected to take, and what happens to the completion date if they slip. A TI that misses a lease commencement date costs a tenant far more than the construction ever did.

Planning a fit-out or a renovation?

Tell us the space, the scope you have in mind and the date you are working to — we will walk it and quote properly.